₹1 cr flat, ₹75L loan. Why do you need close to ₹50L in cash?

Most buyers start with the EMI calculator. The number that actually decides whether you can buy is the cash you need before you get the keys. Moneycontrol made the same point this week

Here’s a ₹1 cr under-construction 2BHK off Thanisandra Main Road:

  • Down payment: ₹25L, not ₹20L. For loans above ₹75L, RBI caps the loan at 75% of the property value, so 80% isn’t available at this ticket size
  • Stamp duty and registration: about ₹7.6L. Karnataka works out to roughly 7.5% all-in now, and lenders don’t fund it
  • GST: about ₹5L. 5% on an under-construction flat. Ready-to-move with OC avoids this
  • Corpus, maintenance advance, BESCOM and water deposits: ₹3 to 5L. It usually shows up in the demand letter at possession
  • Interiors: ₹6 to 10L. Wardrobes, kitchen, lights, a couple of ACs
  • Processing fee, legal and valuation: about ₹40k

That comes to about ₹47 to 53L in cash, against a ₹75L loan.

The EMI on ₹75L was never the problem. Most people who stretch get caught by the extra ₹20 to 25L above the down payment.

When you actually bought, how far off was your first cash estimate?
  • Within 10%, I planned for it
  • 10 to 25% over
  • More than 25% over
  • Haven’t bought yet, this is useful
0 voters

Which cost caught you off guard the most?